Aurum Skyline Residencies – Address You Can Be Proud of. Home Lands Skyline, the real estate arm of Home Lands, the foremost real estate developer in the country has embarked upon yet another Luxury Apartment complex that is to be developed in a convenient, competitive residential precinct. Being the developer of 727 apartment units under their wing, Home Lands Skyline has already completed and delivered some of their project to clients. As their 8th Apartment Development Project, “Aurum Skyline Residencies”, is to be launched successfully in a strategic location, Colombo 05, Jawatta, facing to Thimbirigasyaya road. Contact 0710444111
Living, Dining, Pantry, 02 -03 Bed Rooms, Toilets, Veranda/ Balcony, 02 parking slots per each unit with Mechanical parking system within the complex shall be provided for selected units.
A Reinforced Concrete raft foundation as suggested by the structural engineer
RCC Columns, Beams, Slabs and cement block masonry walls to match the design.
Living, Dining, Bed Rooms and other internal areas to be laid with non-slippery ceramic floor tiles.(2 FT x 2 FT)
Veranda and balconies to be laid with non-slippery rustic ceramic tiles.
Toilets floor to be laid with non-slippery ceramic tiles on water tight (proofed) surface, toilet walls to be laid with ceramic tile up to the ceiling except the maid’s toilet.
Internal walls on other areas to be plastered smooth, apply one coat of wall putty, 2 coats of emulsion paint. Color to be selected by the Architect.
All external walls to be plastered rough or semi – rough and apply wall filler, two coats of weather shield paint. Color to be selected by the Architect.
Fully fitted pantry unit to be supplied and fixed as directed by the architect including Cooker Hood and a Hob , Stainless steel single bowl single drain kitchen sink with chromium plated swan neck tap.
Gas piping system shall be placed for the entire apartment building through gas tanks as directed by the Sri Lanka Fire Department. A single pipe outlet shall be provided to the pantry unit with a separate meter to each unit.
Work 230 V/30 Amp Three phase power supply with separate electricity meter, 13 amp and 15 amp socket outlets, as directed by the Architect.
2 TV and Telephone outlets shall be provided per Unit.
Shaver socket to be provided for Master bathroom.
Fans to be supplied for Living/ Dining, Master Bed Room and other bed rooms.
All apartment units will be fully air conditioned excluding the utility room.
All Apartment units shall be facilitating with smart home solution which involves the control and automation of lighting, heating and air conditioning.
No fittings shall be supplied by the developer; only the point wiring shall be done.
PVC cold pipe network to be placed for each bathroom via a common PVC water tank placed on roof top.
Under ground water sump to be filled with National Water Supply and Drainage Board main and pump to overhead tanks. Separate water meter shall be fixed for each unit.
Fully fitted bathroom with a water closet, wash basin, soap tray, tooth brush holder, hand bidet, toilet paper holder, pencil edged mirror to be provided for all bathrooms except maid’s toilet.
Aluminum glazed Shower slider to be fixed for all bathrooms except maid’s bathroom.
Hot water to be supplied via Geezer to all bathrooms except maid’s toilet.
An Inlet and outlet water point along with a power point to be provided for the washing machine as directed by the architect.
Front door and rear door to be out of Mahogany sash and Class I timber frame, internal doors to be out of solid plywood and Class I timber frame.
Electronic Door Access control system shall be provided with the connection of Smart Home solution
All French and other windows are out of white powder coated aluminum with necessary accessories.
As directed by the Architect.